What happens during an air source heat pump survey in your home?

From room measurements to radiators, hot water, electrics and outdoor siting, here is what a proper survey should cover.

Proudly supporting:

We donate £1 to Samaritans for every successful partner introduction made through our platform

Samaritans is a charity registered in England and Wales (219432) and in Scotland (SC040604).

What to know first

A technical heat pump survey should turn information about your home into a property-specific design, not simply support a sales estimate.

What do I need to know first?

  • Ask whether the visit is a full technical survey or an initial sales assessment.

  • Every heated space should be included, even a hall or landing without a radiator.

  • The surveyor should record room dimensions, construction, insulation, windows, doors and ventilation.

  • Room-by-room heat loss helps size the heat pump and check each heat emitter.

  • Pipework, controls, hot-water storage and indoor equipment space should be assessed.

  • The electrical supply and proposed outdoor position also affect the design.

  • If a Renewable Energy Consumer Code member charges for the survey, the fee must be reasonable and it must provide a written report.

  • Later proposals and quotes should identify assumptions, exclusions and required work.

A full survey is the evidence-gathering stage for the proposed system. Some calculations may be completed afterwards, but the final design should be based on the property rather than a generic house or the output of the old boiler.

The visit does not guarantee suitability, planning status, network approval or scheme eligibility. Those conclusions depend on the completed design and, where relevant, decisions by other organisations.


Is the visit a technical survey or a sales appointment?

Ask this before anyone arrives. Under the Renewable Energy Consumer Code, a member must make clear whether a visit includes a technical site survey. If it charges, it must explain the refund conditions and provide a written report.

An initial appointment may support an indicative proposal. A technical survey validates measurements, records assumptions and identifies work needed for the final design. Ask who will calculate the design, which standard they will follow and which documents are included.

Giles Crosse, Clearwise Energy Editor

Good to know

A survey fee is not automatically a concern. Check the scope, written output and whether any of the fee is credited or refunded.


What happens during the heat pump survey?

1. The surveyor reviews the home

The surveyor may start with the Energy Performance Certificate, plans and evidence of insulation or alterations. They should understand the existing heating and hot-water system, rooms that are difficult to heat, and planned building work that could change heat loss.

An Energy Performance Certificate is useful background, but it contains assumptions. Insulation certificates, drawings or loft access can help replace an assumption with property-specific evidence.

2. Every heated space is measured

The surveyor records room dimensions, windows, external doors and the walls, floors and ceilings or roofs around each space. They note whether adjoining areas are heated, unheated or outside, plus ventilation such as extract fans, chimneys and open flues. Halls and landings still matter even without a radiator.

Microgeneration Certification Scheme (MCS) Heat Load Calculator documentation, accessed on 27 July 2026, states:

All heated spaces within a property must be accounted for in order to calculate an accurate heat load.

— MCS

3. The fabric becomes a heat-loss calculation

“Heat loss” is the rate at which the home loses heat on a cold design day. It is estimated for each room and the whole property, usually in watts or kilowatts.

The calculation uses the size and construction of walls, floors, roofs, windows and doors. It also allows for ventilation, air leakage, room temperature and local winter design conditions. Where construction is hidden, the report should state the assumption rather than present it as measured fact.

Room-by-room results help the designer choose the heat pump capacity and the heat output needed from radiators or underfloor heating in each space.

4. Emitters and pipework are checked

An “emitter” releases heat into a room, such as a radiator or underfloor heating. Its output at the proposed design flow temperature should be compared with the room’s heat loss. Flow temperature is the temperature of the water leaving the heat pump for the heating system.

Some radiators may stay; others may need enlargement, an addition or relocation. The survey should also examine pipe sizes and routes, pumps, controls and any underfloor-heating manifold.

Microbore pipework is not an automatic rejection. It needs a flow and pressure assessment, and restrictive runs may need alteration.

Expert insight

“A credible proposal links each room’s heat loss, emitter output at the proposed flow temperature and the pipework’s ability to move enough water.”

Giles Crosse, Clearwise Energy Editor

Giles Crosse

Energy Editor

Experienced editor, journalist and communications consultant specialising in consumer energy and low carbon technologies.

  • Editor and campaign author for Shell, EDF Energy and Good Energy.
  • Consultant to the United Nations and contributor to the World Economic Forum.
  • Journalist for Reuters, the BBC, The Economist and The Guardian.
More about Giles Crosse

5. Hot water and indoor equipment are assessed

An air-to-water heat pump heats water for radiators or underfloor heating and may also heat water stored in a hot-water cylinder. The survey should record the cylinder’s position, type and size, the cold-water supply and any pipework needed to carry discharged water away. The amount of hot water stored and how quickly it reheats should reflect likely household demand.

The surveyor should also identify space and access for the cylinder and any indoor heating-system equipment, such as pumps or valves, required by the chosen design.

6. The electrical supply is reviewed

The survey should identify the fuse box (consumer unit), space for a new circuit, the main incoming fuse, meter, maximum demand and whether the incoming electricity cable is shared with another property, known as a looped supply. The heat pump, immersion heater and other major electric loads must be considered together.

A qualified electrician may need to confirm the electrical design. The distribution network operator, which runs the local electricity network, may allow connection followed by notification or require approval first. The installer should explain the route and who will handle it.

7. The outdoor position is tested

The surveyor should identify a practical unit position and pipe and cable routes. The location needs an early noise assessment and must suit the selected product’s installation and maintenance instructions.

Planning rules differ across the UK. Listed buildings, conservation areas, flats, local restrictions and the number, size or position of units can change the answer.

Leasehold or shared properties may also require consent from a freeholder, landlord or managing agent.

Giles Crosse, Clearwise Energy Editor

Good to know

“Permitted development” means planning permission may not be needed if every condition is met. Ask who will check planning, building regulations and any consent needed from a landlord, freeholder or managing agent.

The findings may require input from an electrician, distribution network operator, planning authority, conservation officer or property manager.


What should you receive after the survey?

Documents arrive at different stages. The table is a starting point; the contract should state exactly what will be provided.

Document or result What to look for When
Written survey report Measurements, findings, assumptions and unresolved issues After the survey if a Renewable Energy Consumer Code member charged for it; otherwise as agreed before payment.
Room-by-room heat-loss report Each room, whole-home result and design conditions Before system selection is finalised.
Emitter and alteration schedule Flow temperature, radiators, pipework and control changes With the proposed or final design.
Property-specific proposal and quotation Equipment, assumptions, exclusions, permissions, price and timetable Before signing the contract.
Final layout and design Equipment locations and required electrical or heating alterations Before installation starts.

The Renewable Energy Consumer Code Version 8, which remains listed in the 21 July 2026 Boiler Upgrade Scheme notice, says:

Code Members will follow a 'no surprises' pricing policy.

— Renewable Energy Consumer Code

Its code requires an itemised quotation, excluded work and site conditions that could create extra charges to be set out before the contract.

Survey documents are separate from installation handover documents. After commissioning, the installer should provide test records, operating instructions, certificates and guarantees, including the MCS certificate where relevant.


What if the design or price changes?

A survey can reveal greater heat loss, an unsuitable cylinder, electrical work, a planning issue or more radiator and pipework changes than expected. That is one reason to survey before installation.

For a Renewable Energy Consumer Code member, any design that differs from the quotation must be explained in writing. You can cancel and receive a full refund of any deposit or advance payment if the revised system is no longer suitable for your needs. The member must also cancel and make the same refund if the site is unsuitable. If the system can only be installed in a different form or place, it must explain why in writing and agree to cancel and refund you if you are unhappy with the amended design and specifications. Keep the report, quotation and correspondence.

Practical warning signs, inferred from these requirements, include omitting rooms, giving no written assumptions, declaring all radiators suitable without an emitter schedule, ignoring electrics or outdoor siting, and seeking a signature before providing property-specific performance information and an itemised quote.


Key takeaways

  • A technical survey should produce property-specific evidence, not just a sales estimate.

  • Every heated space should feed into the room-by-room heat-loss calculation.

  • Emitters, pipework, hot water, electrics and outdoor siting affect the design.

  • Important assumptions should be recorded.

  • If a Renewable Energy Consumer Code member charges for the survey, the fee must be reasonable and it must provide a written report; otherwise agree the written output before paying.

  • Planning, network and scheme requirements should be rechecked before installation; sources were rechecked on 4 August 2026.


Frequently asked questions

No. Every heated space must be included, including halls and landings that are heated indirectly without their own radiator. Unheated rooms or spaces still need to be identified where they adjoin a heated room, because this affects the heat-loss calculation.

Not for a typical retrofit. It can provide background, but Energy Saving Trust guidance calls for a detailed site survey of an existing property.

Not necessarily. Each radiator’s output at the proposed flow temperature should be compared with that room’s heat loss.

No. It needs a flow and pressure assessment; some runs work, while restrictive sections may need replacement.

Not necessarily. The survey should assess the existing cylinder, water supply, available space and proposed hot-water arrangement.

Not always. It should identify supply information, but an electrician and distribution network operator may need separate checks or approval.

Yes, if a Renewable Energy Consumer Code member charges for the technical survey. Otherwise, agree the written deliverables before paying.

It follows the applicable Microgeneration Certification Scheme requirements. For the Boiler Upgrade Scheme in England and Wales, the notice updated on 21 July 2026 lists MIS 3005-D Issue 2.0 as the approved heat-pump design standard.

No. It can identify likely requirements, but planning authorities, scheme administrators and other decision-makers apply their rules.

The installer should explain the revised design and price in writing. If it is a Renewable Energy Consumer Code member, you can cancel and receive a full refund of any deposit or advance payment if the revised system is no longer suitable for your needs. The member must cancel and make the same full refund if the site is unsuitable. It must also agree to cancel and refund you if you are unhappy with a system that can only be installed in a different form or place.

  1. Microgeneration Certification Scheme (2024; accessed 27 July 2026). MCS Heat Load Calculator: Introduction.

    https://heatloadcalculator.mcscertified.com/docs/getting-started/introduction
  2. Microgeneration Certification Scheme (accessed 27 July 2026). MCS Heat Load Calculator: Heated Rooms Page.

    https://heatloadcalculator.mcscertified.com/docs/usage/heated-rooms-page
  3. Microgeneration Certification Scheme (2024; accessed 27 July 2026). MCS Heat Load Calculator: Room Detail Page.

    https://heatloadcalculator.mcscertified.com/docs/usage/room-detail-page
  4. Energy Saving Trust (2026). Heat loss calculations — detailed guidance.

    https://greenheattoolkit.energysavingtrust.org.uk/t/heat-pump-installers-toolkit/heat-pump-system-design/heat-loss-calculations-detailed-guidance/
  5. Energy Saving Trust (2026). Electrical load check.

    https://greenheattoolkit.energysavingtrust.org.uk/t/heat-pump-installers-toolkit/installation-considerations/electrical-load-check/
  6. Energy Saving Trust (2026). How to make microbore pipes work.

    https://greenheattoolkit.energysavingtrust.org.uk/t/heat-pump-installers-toolkit/heat-pump-system-design/how-to-make-microbore-pipes-work/
  7. Energy Networks Association (accessed 27 July 2026). Connecting electric vehicles and heat pumps to the networks.

    https://www.energynetworks.org/industry/connecting-to-the-networks/connecting-electric-vehicles-and-heat-pumps
  8. Renewable Energy Consumer Code (2023). Consumer Code, Version 8.

    https://www.recc.org.uk/scheme/consumer-code
  9. Department for Energy Security and Net Zero (2026). Notice of standards.

    https://www.gov.uk/government/publications/boiler-upgrade-scheme-regulations-approved-standards-grant-categories-and-grant-levels/notice-of-standards
  10. GOV.UK (accessed 4 August 2026). Apply for the Boiler Upgrade Scheme: What you can get.

    https://www.gov.uk/apply-boiler-upgrade-scheme/what-you-can-get
  11. Ofgem (accessed 4 August 2026). Boiler Upgrade Scheme (BUS).

    https://www.ofgem.gov.uk/environmental-and-social-schemes/boiler-upgrade-scheme-bus
  12. London Borough of Richmond upon Thames (2026). Planning guidance for heat pumps.

    https://www.richmond.gov.uk/services/planning/planning_guidance_heat_pumps
  13. Welsh Government (accessed 4 August 2026). Planning permission: domestic heat pumps.

    https://www.gov.wales/planning-permission-heat-pumps
  14. Scottish Government (2024). Planning circular 1/2024: householder permitted development rights — 6. Installing Microgeneration Equipment.

    https://www.gov.scot/publications/circular-1-2024-householder-permitted-development-rights/pages/6/
  15. Northern Ireland Department for Infrastructure (2023). Changes to permitted development rights for domestic heat pumps.

    https://www.infrastructure-ni.gov.uk/news/changes-permitted-development-rights-domestic-heat-pumps
  16. Westmorland and Furness Council (accessed 27 July 2026). Air source heat pumps.

    https://www.westmorlandandfurness.gov.uk/planning-and-building-control/planning/common-planning-projects/air-source-heat-pumps
  17. Planning Portal (accessed 4 August 2026). Planning Permission: Air source heat pump.

    https://www.planningportal.co.uk/permission/common-projects/heat-pumps/planning-permission-air-source-heat-pump/
Giles Crosse, Clearwise Energy Editor
Giles Crosse

Energy Editor

Learn more about air source heat pumps from our expert Giles Crosse.

Learn more about air source heat pumps

For a complete overview of air source heat pumps, dive into our comprehensive guide.