What to know first
This summary explains what headline price, savings and grant claims can—and cannot—tell you before a property survey.
What do I need to know first?
-
A “from” price is a starting price, not an average or personal quote.
-
Check whether the displayed price is before or after a government grant.
-
Grant access depends on the scheme, property, existing heating and technology.
-
A savings figure may use assumptions that do not match your home or tariff.
-
Ask whether radiators, a hot-water cylinder, electrical work and controls are included.
-
A low headline price may exclude planning, structural or site-preparation costs.
-
The installer should survey the property and explain expected performance before work starts.
-
Keep the advert, calculation, quote and contract because they may describe different things.
A heat pump advert can be accurate for a defined group without describing what most readers will pay or save. Treat each headline as a claim about a particular scenario, then identify the grant, property, tariff and installation assumptions behind it.
Recent Advertising Standards Authority (ASA) rulings cover a £500 installation price, a £546 first-year saving and grant messages that did not make eligibility prominent enough. They concern specific adverts at specific dates; they are not findings that every low price or savings estimate is misleading.
What the recent ASA rulings tell consumers
The cases raise three questions: can enough customers achieve the headline, are the assumptions clear, and is important information visible before someone moves towards a quote?
| Advert claim | What the ASA found | What to ask |
|---|---|---|
| “Installs from £500” | When the advert appeared in September 2024, 5.8% of sales were at or below £500. The ASA found insufficient evidence that a significant proportion of the targeted consumers could achieve it. Grant conditions, the suitability survey and possible preparatory costs were also not clear enough. | How many comparable customers paid this, and what was excluded? |
| “Save up to £546” | The figure used assumptions about energy use, tariffs, boiler efficiency, cooking fuel, the gas standing charge and heat-pump performance. The ASA found that basis undisclosed and the broad claim inadequately substantiated. | Compared with which system, tariff and household? |
| “£7,500 grant available” | In separate Aira and EDF rulings, the ASA said eligibility needed to appear in the advert. A landing page or later quote journey was not enough. | Which scheme is this, who may qualify and is it already deducted? |
Good to know
An upheld ruling does not prove that no customer could obtain the advertised outcome. It means the claim, evidence or qualifications did not meet the required standard in the form assessed.
The Committee of Advertising Practice summarised the pricing principle in April 2026:
Consumers shouldn’t have to follow a series of complicated steps to understand what they’ll actually pay.
What does a “from £500” price really mean?
“From” identifies the lowest qualifying price. It does not show the median, most common price or likelihood that your property will receive it. Competition and Markets Authority guidance says an indicative price should realistically reflect what a significant proportion of the relevant audience can expect, with important qualifications close to the figure.
For context, Energy Saving Trust gave around £12,000 as a typical air source heat-pump installation cost on 16 July 2026, while stressing that the pump, property and radiator work change the total. That is not a fixed market price or proof that a lower offer is impossible.
Ask for the price before grant, the grant deducted and the balance. Check whether “standard installation” includes the pump, cylinder, radiators, pipework, electrics, controls, labour and commissioning. Ask separately about planning, unusual access, structural work and site preparation.
“Complete the headline: “This price applies to these homes, after this grant, for this installation, with these exclusions.” Each missing part is a question.”
Giles Crosse
Energy Editor
Experienced editor, journalist and communications consultant specialising in consumer energy and low carbon technologies.
- Editor and campaign author for Shell, EDF Energy and Good Energy.
- Consultant to the United Nations and contributor to the World Economic Forum.
- Journalist for Reuters, the BBC, The Economist and The Guardian.
How should I test a heat-pump savings claim?
Treat a savings figure as a comparison, not a promise. Check:
the existing heating system and assumed efficiency;
household heating and hot-water use;
old and new tariffs;
whether a gas standing charge remains;
the heat pump’s seasonal performance;
assumed insulation, radiator and control changes; and
the period covered by the figure.
Seasonal Coefficient of Performance, or SCOP, estimates efficiency across a heating season. A property design may instead show a Seasonal Performance Factor. Energy Saving Trust says installers should calculate expected seasonal performance because location, radiator size and system design affect it.
Running costs are not automatically lower. They depend on the system being replaced, radiator sizing, controls and electricity tariff. Energy Saving Trust says a heat pump can cost slightly more than a new gas or oil boiler on standard tariffs, while a suitable time-of-use tariff can change the comparison.
“Terms apply” is not a substitute for a clear qualification. In the British Gas ruling, the ASA said the modelled basis and assumptions were material information even though a linked page contained a footnote.
Read the grant claim separately from the installation price
As checked on 20 August 2026, the Boiler Upgrade Scheme (BUS) applies in England and Wales.
| Eligible installation category | BUS amount |
|---|---|
| Air-to-water heat pump | £7,500 |
| Residential air-to-air heat pump | £2,500 |
| Air-to-water heat pump at an eligible off-gas-grid property replacing oil or liquefied petroleum gas | £9,000 |
The £9,000 uplift covers qualifying applications properly made from 21 July 2026 to 31 March 2027. “Properly made” means Ofgem has the required information and the owner has completed consent and identity verification—not merely that an installer has started an application.
Air-to-water systems supply radiators or underfloor heating and usually hot water. Air-to-air systems distribute warm air and are a different product, so the advert should identify which type supports its claim.
The grant is applied upfront through the installer. Ofgem says the quote must show the total before discount, the grant and the balance; the property owner does not receive the advertised amount as cash.
Good to know
The 2025 ASA rulings described a valid Energy Performance Certificate as a BUS condition at that time. For applications properly made from 28 April 2026, Ofgem says an installer may provide alternative evidence where no valid certificate exists.
Scotland has separate Home Energy Scotland support, including up to £7,500 grant funding for an eligible whole-home heat pump, an optional interest-free loan and a rural uplift. BUS does not cover Northern Ireland; NI Energy Advice provides free, impartial information on support.
What should I check before requesting or accepting a quote?
Before giving personal details, ask:
Is the headline for air-to-water or air-to-air equipment?
Is the price before or after a grant?
Which eligibility and property assumptions apply?
What work is included, excluded or still unknown?
How was any bill saving calculated?
What changes if the survey, grant decision or design changes the price?
For a BUS installation, the usual sequence is:
Choose an installer. The work must use a Microgeneration Certification Scheme-certified installer able to apply on your behalf.
Have the home assessed. The installer should cover heat loss, system design, radiator or cylinder needs and expected seasonal performance.
Read the itemised quote. It should separate the gross cost, grant and customer payment, and identify exclusions.
Complete the grant checks. The installer applies; Ofgem contacts the owner for consent and identity verification. Scheme consent does not replace the private contract.
Check the contract risk. Confirm what happens if a voucher, design or timetable changes, then compare total cost, performance, warranty and exclusions across quotes.
What if something goes wrong?
For a potentially misleading advert, keep a screenshot and note where and when it appeared. The ASA asks complainants to identify the claim or image they object to and covers most paid online advertising and company website claims.
For a contract or installation problem, complain to the trader first and retain the paperwork. Citizens Advice says an MCS or TrustMark complaint route may also be available. Property-specific issues may require an installer, independent assessor, planning authority, freeholder or consumer-protection body.
Key takeaways
A “from” price is not a typical price or a promise.
Separate the full installation cost from any grant.
Ask for every assumption behind a bill-saving figure.
Check the heat-pump type because grants and scope differ.
Rely on the itemised quote and contract, not the advert alone.
Recheck scheme amounts and conditions before proceeding.
Frequently asked questions
-
Potentially, after a grant and in a narrowly defined installation. The Octopus ruling said the evidence did not show that a significant proportion of the targeted consumers could achieve it when the advert appeared.
-
No. It is a lower starting point, although CMA guidance says it should still be realistic and achievable for a significant proportion of the relevant audience.
-
No. The British Gas figure used specific modelled assumptions, and the ASA found the broad claim inadequately substantiated as presented.
-
The air-source amounts are £7,500 for air-to-water, £2,500 for eligible residential air-to-air, and a temporary £9,000 uplift for qualifying off-gas-grid oil or LPG replacements.
-
Not necessarily. Under Ofgem guidance applying from 28 April 2026, the installer may provide alternative evidence where a valid Energy Performance Certificate is unavailable.
-
No. It is an upfront discount applied by the installer, and the quote should separate the full cost, grant and remaining payment.
-
It should show the system, design, gross price, grant, balance, included work and exclusions, alongside expected performance.
-
No. BUS covers England and Wales, Scotland has separate support, and Northern Ireland households should check current options with NI Energy Advice.
-
Advertising complaints can go to the ASA. Contract or installation disputes should first go to the trader, with Citizens Advice or a relevant certification scheme available for further support.
-
Advertising Standards Authority (2025). ASA Ruling on Octopus Energy Ltd.
https://www.asa.org.uk/rulings/octopus-energy-ltd-g24-1271647-octopus-energy-ltd.html -
Advertising Standards Authority (2026). ASA Ruling on British Gas Services Ltd t/a British Gas.
https://www.asa.org.uk/rulings/british-gas-services-ltd-a25-1295064-british-gas-services-ltd.html -
Advertising Standards Authority (2025). ASA Ruling on Aira Home UK Ltd.
https://www.asa.org.uk/rulings/aira-home-uk-ltd-a25-1281128-aira-home-uk-ltd.html -
Advertising Standards Authority (2025). ASA Ruling on EDF Energy Ltd t/a EDF.
https://www.asa.org.uk/rulings/edf-energy-ltd-a25-1281130-edf-energy-ltd.html -
Advertising Standards Authority and Committee of Advertising Practice (2026). Bill ieve it or not: making greener homes savings claims add up.
https://www.asa.org.uk/news/bill-ieve-it-or-not-making-greener-homes-savings-claims-add-up.html -
Competition and Markets Authority (2024). Marketing green heating and insulation products: consumer law compliance advice for businesses.
https://www.gov.uk/government/publications/marketing-green-heating-and-insulation-products/marketing-green-heating-and-insulation-products-consumer-law-compliance-advice-for-businesses -
Ofgem (2026). Boiler Upgrade Scheme: Guidance for Property Owners, version 5.1.
https://www.ofgem.gov.uk/guidance/boiler-upgrade-scheme-guidance-property-owners -
Department for Energy Security and Net Zero (2026). Notice of approved grant categories and values for the Boiler Upgrade Scheme.
https://www.gov.uk/government/publications/boiler-upgrade-scheme-regulations-approved-standards-grant-categories-and-grant-levels/notice-of-approved-grant-categories-and-values-for-the-boiler-upgrade-scheme -
Energy Saving Trust (2026). Air source heat pumps: costs, savings and benefits.
https://energysavingtrust.org.uk/advice/air-source-heat-pumps/ -
Energy Saving Trust (accessed 20 August 2026). Heat pumps: how they work, costs and savings.
https://energysavingtrust.org.uk/advice/in-depth-guide-to-heat-pumps/ -
Home Energy Scotland (accessed 20 August 2026). Home Energy Scotland Grant and Loan.
https://www.homeenergyscotland.org/home-energy-scotland-grant-loan -
Home Energy Scotland (accessed 20 August 2026). Home Energy Scotland Grant and Loan: terms and conditions.
https://www.homeenergyscotland.org/home-energy-scotland-grant-loan-terms-conditions -
Northern Ireland Housing Executive (accessed 20 August 2026). Energy advice.
https://www.nihe.gov.uk/Community/NI-Energy-Advice -
Advertising Standards Authority (accessed 20 August 2026). Make a complaint.
https://www.asa.org.uk/make-a-complaint.html -
Citizens Advice (accessed 20 August 2026). Complaining about an energy efficiency home improvement.
https://www.citizensadvice.org.uk/consumer/energy/energy-supply/save-energy-at-home/complaining-about-an-energy-efficiency-home-improvement/